BUILd ON SITE custom storage buildings

Build On Site

Take Advantage of Portable Buildings Built on Site

(Select Areas)

If your property does not accommodate the delivery of a complete, prebuilt building due to unlevel terrain, narrow entry points, fences, or other obstructions, a site-built shed may be an necessary option for your portable building.


Our team of skilled shed manufacturers will deliver the pre-assembled shed components to your property and complete the construction on-site. Whether pre-built or on-site, you will want to ensure that the site is properly prepared.

Minimum 4-Foot Clearance

No Heavy Equipment

Installation Completed On Site

Minimal Preparations


WHAT ARE THE ADVANTAGES?

  • Slide title

    Write your caption here
    Button

Navigate Tight Spaces

If you are needing a 16x40 lofted barn, but the path to access the site only has an opening for a 10x20 shed, an on-site build will help alleviate those size limitations. All materials are carried from the trailer to the site by installers and building is constructed in the desired location.


Minimal Preparations Needed

Depending on the shed you are purchasing and the conditions of the terrain where it will be delivered, there may be significant work involved to prepare the site for delivery. Maybe the desired location for your shed is simply not accessible with a trailer or the mule. On-site builds can alleviate some of the hassle of site preparation and accessibility issues.

Maneuver Around Landscaping

Build on Site option allows set up and installation on properties which have mature landscaping or other permanent structures which could be difficult or costly to remove.

Fences Remain Intact

Unlike delivery of shop-constructed buildings which require an access path the width of the building plus an additional 2' clearance on either side, Build on Site only requires a 4' wide material entry location.

No Heavy Equipment

With build on site, materials are carried to site by installers which reduces the risk of lawn damage from hauling the weight of fully-constructed buildings.


Watch Assembly

Get a first-hand look at the quality of our construction! Our buildings are engineered to be durable and approved for even the most exacting state and local restrictions throughout our service area. Most buildings will be completed in one day.

  • Slide title

    Write your caption here
    Button

Build on site is eligible for property owners only. It is the sole responsibility of the customer to obtain any

required city and/or state construction permits. Building site should have a 3’ clearance from any adjacent

structures, including but not limited to buildings, fences, trees, etc.

Request Build-On-Site Information

Contact your personal Stor-Mor representative for custom pricing and build-on-site availability now!


Build-On-Site Inquiry

Contact A Stor-Mor Dealer Today

Build On Site

Share by: